•a.Replace berths with CPO modular berths with privacy partitions and berth curtains arranged in six-person cubicles, as practical, with ten percent long berths. Total number of new berths shall be equal to or exceed the existing berthing and as a min
•b.Redistribute air supply terminals to provide overhead diffusers within each berth cubicle.
•c.Provide lockers for stowage of clothing and personal effects to meet or exceed minimums required per accommodations. For CPO (E7-E9) provide 14 cubic feet of locker space, 18 inches hanging space, 2 cubic feet seabag stowage and 0.75 cubic feet of
•d.Redistribute overhead lighting to conform to new arrangements. Provide one berth light per accommodation and mirror lights as required.
•e.Replace deck covering.
•f.Replace any damaged insulation.
•g.Paint bulkheads and overheads.
•h.Provide a means of secondary egress if one does not exist and berthing capacity exceeds 21 personnel.
•i.Provide recreation/lounge area in berthing compartments segregated from sleeping area with metal joiner bulkhead, if total bunk count and locker cubage meets minimum requirements. As a minimum for CPO (E7-E9) provide one seat and writing space for
•j.Provide storage for iron and ironing board.
•k.Provide bulletin boards, watch-quarter boards and mirrors.