My Home   |   Read   |   Edit   |   Export   | |   New User   |   Login     
Opening Editor...
  • 6 PROJECT TYPES (12)
    • 6 BCPO (11)
      • a.Replace berths with CPO modular berths with privacy partitions and berth curtains arranged in six-person cubicles, as practical, with ten percent long berths. Total number of new berths shall be equal to or exceed the existing berthing and as a min (0)
      • b.Redistribute air supply terminals to provide overhead diffusers within each berth cubicle. (0)
      • c.Provide lockers for stowage of clothing and personal effects to meet or exceed minimums required per accommodations. For CPO (E7-E9) provide 14 cubic feet of locker space, 18 inches hanging space, 2 cubic feet seabag stowage and 0.75 cubic feet of (0)
      • d.Redistribute overhead lighting to conform to new arrangements. Provide one berth light per accommodation and mirror lights as required. (0)
      • e.Replace deck covering. (0)
      • f.Replace any damaged insulation. (0)
      • g.Paint bulkheads and overheads. (0)
      • h.Provide a means of secondary egress if one does not exist and berthing capacity exceeds 21 personnel. (0)
      • i.Provide recreation/lounge area in berthing compartments segregated from sleeping area with metal joiner bulkhead, if total bunk count and locker cubage meets minimum requirements. As a minimum for CPO (E7-E9) provide one seat and writing space for (0)
      • j.Provide storage for iron and ironing board. (0)
      • k.Provide bulletin boards, watch-quarter boards and mirrors. (0)
  • [Deleted items] (0)